| Artikelnummer | 211915537 | Erscheinungsdatum | 2026/04/06 | Listenpreis | €25.50 | Modellnummer | 211915537 | ||
|---|---|---|---|---|---|---|---|---|---|
| Kategorie | |||||||||
Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. This switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode.
| UPC | 763273899213 798459086095 |
|---|---|
| Color | Blue |
| Model | BX88272 |
| Terminal | Physical |
| Brand Name | Blue Ox |
| Unit Count | 1.0 Count |
| Item Weight | 4.16 ounces |
| Switch Type | Rotary |
| Circuit Type | parallel |
| Contact Type | Normally Open |
| Manufacturer | Blue Ox |
| Actuator Type | Rotary |
| Material Type | Metal |
| Mounting Type | Panel Mount |
| Connector Type | Crimp |
| Control Method | Touch |
| Current Rating | 20 Amps |
| Operation Mode | ON-OFF |
| Item Dimensions | 3.25 x 7 x 13 inches |
| Number of Items | 1 |
| Contact Material | Metal |
| Operating Voltage | 12 Volts (DC) |
| Specification Met | Etl, Ce, Ip67 |
| Number of Positions | 2 |
| Warranty Description | 1 Year |
| Connectivity Protocol | X-10 |
| International Protection Rating | IP00 |
| Global Trade Identification Number | 00798459086095 |
Wenn Sie Unvollständigkeiten oder Fehler in den Produktinformationen auf dieser Seite bemerken, nutzen Sie bitte das Korrekturformular unten.
Korrekturanfrage